Project: Driveway, Thurles, Co.Tipperary.
Materials Used: Slane cobbles, rustic blocks with charcoal border.
Grand Canal Dock
Project: Grand Canal Dock
Wall cladding 800m2 and 5000m2 of paving.
Contractor: Siac Construction Ltd.
DIT Grangegorman Campus
Project: DIT Grangegoreman Campus
6000m2 granite setts & flags.
Contractor: Shareridge Civil Engineering
Our Lady's Hospice
Project: Our Lady`s Hospice
Combination of Resin Bound Surface and aluminium trim edging and Paving -1000m2.
Contractor: Clancy Construction
TCD Student Accommodation
Project: TCD Student Accommodation
1000m2 paving and 500m2 Resin Bound Surface.
Contractor: Bennett Construction Ltd.
Greystones Pier
Project: Greystone Pier
3000m2 brick and flags paving.
Contractor:Peter O`Brien and Sons Landscaping
Colaiste Raithin, Bray
Project: Colaiste Raithin Bray
900m2 paving bricks incorporated resin bound surface.
Contractor:Sammon Group
Adare Manor
Project: Adare Maonor
Supply & Installation 4,000m Kilkenny limestone; installation 3,500sq m Kilkenny limestone paving, 1500m2 Italian Porphyry (including fantails to main entrance; 00sm m black granite paving; 200m bespoke limestone steps; bespoke radius paving to Parterre Garden.
Contractor: John Paul Construction
Completed: October 2017
Miesian Plaza
Project : Miesian Plaza, Baggot St
Installation 4,000m2 granite paving including granite tactile paving, steps, and setts; installation 600m stainless steel slot drainage
Contractor : John Paul Construction
Completed : October 2017
Pairc Ui Caoimh
Project : Pairc Ui Chaoimh
Supply & installation 2,000m2 granite effect paving flags; 2,000m2 grasscrete, complete with topsoil and seeding; installation 3,000m2 granite paving
Contractor : SISK
Completed : July 2017